• ANS 58.8-1994 (R2008)
Provide PDF Format

Learn More

ANS 58.8-1994 (R2008)

  • Time Response Design Criteria for Safety Related Operator Actions
  • standard by American Nuclear Society, 08/23/1994
  • Publisher: ANS

$35.00$70.00


Establishes time response design criteria for safety-related operator actions to be used in design of light water reactor nuclear power plants. Specifies time requirements that are to be met to receive credit in the safety analysis for operator actions.

Related Products

ANS 8.20-1991(R2005)

ANS 8.20-1991(R2005)

Nuclear Criticality Safety Training..

$24.00 $47.00

ANS 57.10-1987

ANS 57.10-1987

Design Criteria for Consolidation of LWR Spent Fuel..

$65.00 $129.00

ANS 53.1-2011

ANS 53.1-2011

Nuclear Safety Design Process for Modular Helium-Cooled Reactor Plants..

$117.00 $233.00

ANS 58.21-2007

ANS 58.21-2007

External Events in PRA Methodology..

$118.00 $235.00