• ASME B30.18-1998
Provide PDF Format

Learn More

ASME B30.18-1998

  • Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist)
  • standard by ASME International, 01/01/1998
  • Publisher: ASME

$57.00$113.00


Applies to the construction, installation, operation, inspection and maintenance of overhead and gantry stacker cranes with top running or under running bridge, multiple girder. The vertical mast for guiding the carriage is attached to the top running or under running trolley. These cranes are grouped because they all have the same features in vertically guiding the lifted load. Stacker cranes in this grouping include semi-gantry, cantilever gantry, and others having the same fundamental characteristics.

Related Products

Taguchi Methods for Robust Design

Taguchi Methods for Robust Design

Customers Who Bought This Also Bought..

$38.00 $75.00

ASME B30.22-2000

ASME B30.22-2000

Articulating Boom Cranes..

$32.00 $63.00

ASME B18.10-2006 (R2016)

ASME B18.10-2006 (R2016)

Track Bolts and Nuts..

$19.00 $38.00

ASME HST-1-1999 (R2004)

ASME HST-1-1999 (R2004)

Performance Standard for Electrical Chain Hoists..

$18.00 $36.00