• AWWA MTC50273
Provide PDF Format

Learn More

AWWA MTC50273

  • Meeting the Demand for Potable Water in Orange County in the 21st Century: The Role of Membrane Processes
  • Conference Proceeding by American Water Works Association, 01/01/1999
  • Publisher: AWWA

$12.00$24.00


The Orange County Water and Sanitation Districts have developed the Groundwater Replenishment System (GWR), a project that would be implemented in three phases, beginning in the year 2003, and will ultimately produce 100,000 acre-feet per year (afy) of high quality water by the year 2020. This water will represent 20% of the fresh water supply used to recharge the Orange County groundwater basin, which provides up to 75% of the potable water for nearly two million county residents. The following paper provides a brief description of the treatment objectives and the benefits of the GWR system. Includes 7 references, tables.

Related Products

AWWA CSC91019

AWWA CSC91019

High Technology Procurement..

$12.00 $24.00

AWWA REUSE52119

AWWA REUSE52119

Water Reuse in Texas: A State Level Perspective..

$12.00 $24.00

AWWA WQTC50505

AWWA WQTC50505

Optimization of C. parvum Inactivation With Ozone/Free Chlorine and Ozone/Monochloramine..

$12.00 $24.00

AWWA M25

AWWA M25

Flexible-Membrane Covers and Linings for Potable Water Reservoirs - WITHDRAWN..

$40.00 $79.00