• AWWA MTC53933
Provide PDF Format

Learn More

AWWA MTC53933

  • Accepting MF/UF Technology, Making the Final Cut
  • Conference Proceeding by American Water Works Association, 05/01/2001
  • Publisher: AWWA

$12.00$24.00


In recent years, several new treatment technologies, including membranefiltration, have been proposed to the Wisconsin Department of Natural Resources(WDNR). The goal of this paper is to describe the process through which the state regulatory agency approved several membranefiltration plants. At present, there are two operating membrane filtration plantsin Wisconsin with two more under construction. These include a 14 million gallonper day (MGD) US Filter/Memcor plant at Kenosha and a 10 MGD ultrafiltration (UF)Filter/Memcor plant at Manitowoc. Both use Lake Michigan as a source. A 18 MGD(winter)/24 MGD (summer) Koch ultrafiltration plant at Appleton is scheduled tobe in service by the summer of 2001. Appleton uses Lake Winnebago as a source andpretreatment will include lime softening and GAC contactors. A 2 MGD USFilter/Memcor plant at Ashland using Lake Superior water is also scheduled to be inservice by the summer of 2001. Includes figures.

Related Products

AWWA JAW10834

AWWA JAW10834

Journal AWWA - Negotiating Construction Claims ..

$15.00 $30.00

AWWA MTC64637

AWWA MTC64637

The Ammonia- Carbon Dioxide Forward Osmosis Desalination Process: A High Recovery Alternative to Rev..

$12.00 $24.00

AWWA ACE68885

AWWA ACE68885

How Prepared Are You for a Major System Failure?..

$12.00 $24.00

AWWA ACE70882

AWWA ACE70882

Pilot Testing of Zero Liquid Discharge (ZLD) Technologies Using Brackish Groundwater for Inland Dese..

$12.00 $24.00