• AWWA MTC64545
Provide PDF Format

Learn More

AWWA MTC64545

  • Ultrafiltration for Hydrogen Sulfide Removal
  • Conference Proceeding by American Water Works Association, 03/01/2007
  • Publisher: AWWA

$12.00$24.00


This slide presentation outlines a project to evaluate treatment alternatives for H<sub>2</sub>Sremoval while meeting water quality (WQ) standards.Parameters of greatest concern included:H<sub>2</sub>S: < 0.1 mg/L; and, Turbidity: < 1.0 NTU. The project alsoevaluates treatment alternatives that canconsistently meet the above criteria. The process chemistry involvedultrafiltration based on partial oxidation of H2S:, and a schematic of the Pilot Plant Configurations is provided. Conclusions of treated water quality are outlined, and the ranking results were 1.Biological Oxidation followed by UF, and2. Chlorine Oxidation followed UF. Includes tables, figures.

Related Products

AWWA M60

AWWA M60

M60: Drought Preparedness and Response..

$52.00 $104.00

AWWA JTMGT61326

AWWA JTMGT61326

Constructive Outcomes for Utility Reorganization..

$12.00 $24.00

AWWA JAW3023

AWWA JAW3023

Journal AWWA - The Why, What, and How of Maintaining System Records ..

$15.00 $30.00

AWWA IMTECH54036

AWWA IMTECH54036

Metrics to Evaluate Effectiveness of Web Sites..

$12.00 $24.00