• DOXPUB 11-0082-SOP
Provide PDF Format

Learn More

DOXPUB 11-0082-SOP

  • Facility Drawing Control
  • standard by Doxpub, Inc., 08/01/2007
  • Publisher: DOXPUB

$20.00$39.00


Summary:

Describes the control and changes of facility as-built drawings. Applicable to all facility as-built drawings including, but are not limited to architectural drawings, mechanical drawings (HVAC, building utilities, process heating and cooling, etc.), P&IDs (piping and instrument diagrams), electrical, security, and control drawings, and loop diagrams for process equipment.

Included Sections:

Purpose, Scope, Responsibility, References and Applicable Documents, Materials and Equipment, Health and Safety Considerations, Documentation Requirements, and Procedures

Included Attachments/Appendices:

Logsheet for Redlining of Facility Drawings

About This Document:

This is not a generic template, it's a 4-page procedure that was actually created and used in the Facilities & Equipment operations of a FDA-regulated establishment. The company-specific information (names, addresses, some images, proprietary product information, etc.) has been redacted but the content and format have been largely preserved.

Reasons to Buy:

  • Use it as a starting point for your own documentation project
  • Compare the quality of your documents against your industry peers
  • Learn what other companies in your industry are actually doing

Who Will Benefit:

  • Manufacturing Personnel
  • Facilities Managers
  • Laboratory Personnel

Related Products

DOXPUB 11-0074-SOP

DOXPUB 11-0074-SOP

Dispensing Using the Watson-Marlow 505Di Pump with 505L Pumphead..

$15.00 $29.00

DOXPUB 02-0044-SOP

DOXPUB 02-0044-SOP

Preparation of Filling Tubing for the 505LA Pumphead..

$10.00 $19.00

DOXPUB 15-0026-SOP

DOXPUB 15-0026-SOP

Cytotoxicity Assay for Testing of Solid Material..

$25.00 $49.00

DOXPUB 18-0012-SOP

DOXPUB 18-0012-SOP

Investigator Brochure..

$10.00 $19.00