• PIP CVS02100
Provide PDF Format

Learn More

PIP CVS02100

  • Site Preparation, Excavation, and Backfill Specification [Editorial Revision]
  • standard by Process Industry Practices, 05/01/2014
  • Publisher: PIP

$50.00$100.00


This Practice provides the requirements for site preparation, excavation, and backfill. This Practice describes the requirements for excavation, placement, inspection, and management of earthen and organic materials during the site preparation, excavation, and backfill phase of a construction project.

Related Products

PIP PN06CM1S01

PIP PN06CM1S01

Piping Material Specification 6CM1S01 Class 600, 9 CR - 1 MO, 0.063" C.A. Process [Complete Rev..

$38.00 $75.00

PIP VESST001

PIP VESST001

Shell and Tube Heat Exchanger Specification..

$205.00 $410.00

PIP VEFV1100M

PIP VEFV1100M

Vessel/S&T Heat Exchanger Standard Details (Metric Units) [Technical Correction]..

$563.00 $1,125.00

PIP PNSMV006

PIP PNSMV006

Carbon Steel Ball Valve Descriptions [Technical Revision]..

$50.00 $100.00