• PIP PNE00003
Provide PDF Format

Learn More

PIP PNE00003

  • Process Unit and Offsites Layout Guide [Complete Revision]
  • standard by Process Industry Practices, 06/01/2013
  • Publisher: PIP

$53.00$105.00


This Practice provides guidance for the design and layout of process units and offsites. This guide should be used as a starting point for the development of plans, electronic models, and working drawings for process units and offsites. This Practice should be coordinated with the overall site and offsites layout for geotechnical, grading, zoning, building codes, life safety code, fire codes, other regulatory requirements, and owner?s and insurer?s risk assessment requirements.

This Practice describes the guidelines for the layout of plot areas, equipment, pipe racks, piping, platforms, roadways, and other miscellaneous items.

Layout includes equipment location, access and egress for personnel safety, access for operations and maintenance, and provisions for operational housekeeping and constructability.

Related Products

PIP VECV1001

PIP VECV1001

Vessel Design Criteria ASME Code Section VIII, Divisions 1 and 2 [Complete Revision]..

$63.00 $125.00

PIP RESP003S-DM-EEDS

PIP RESP003S-DM-EEDS

Electronic Entry Data Sheet for High Power Vertical Submerged Motor Centrifugal Pumps for Water Serv..

$63.00 $125.00

PIP ELSSG04

PIP ELSSG04

Automatic Transfer Systems for Secondary Selective Substations [New Practice]..

$50.00 $100.00

PIP RFIA1000

PIP RFIA1000

Refractory Anchor and Accessory Installation Details [New Practice]..

$550.00 $1,100.00