• SAE ARP5718A
Provide PDF Format

Learn More

SAE ARP5718A

  • Process to Obtain Holdover Times for Aircraft Deicing/Anti-Icing Fluids, SAE AMS1428 Types II, III, and IV
  • standard by SAE International, 11/01/2012
  • Publisher: SAE

$37.00$74.00


This document describes: a. the preparatory steps to test experimental Type II, III and IV fluids according to AMS1428; b. the recommendations for the preparation of samples for endurance time testing according to ARP5485; c. a short description of recommended field spray test; d. the protocol to generate draft holdover time guidelines from endurance time data as obtained from ARP5485; e. the protocol for inclusion of Type II, III, and IV fluids on the FAA and Transport Canada lists of fluids and the protocol for updating the lists of fluids; f. the role of the SAE G-12 Aircraft Deicing Fluids Subcommittee; g. the role of the SAE G-12 Holdover Time Committee; h. the process for the publication of Type II, III and IV holdover time guidelines.

This document does not describe laboratory testing procedures.

This document does not include the qualification process for AMS1424 Type I fluids.

Related Products

SAE AS 81582/8

SAE AS 81582/8

Connector, Adapter Assembly, Umbilical Cable to Stores Interface, Lanyard Release..

$37.00 $74.00

SAE ARP1675

SAE ARP1675

Structural Weldbonding of Aluminum Structures..

$37.00 $74.00

SAE MA2026B

SAE MA2026B

FITTING, ELBOW, 90°, THIN WALL, FLARELESS, METRIC..

$37.00 $74.00

SAE AS340A

SAE AS340A

Cover - Shipping Container Inspection Port (Stabilized: Aug 2014)..

$37.00 $74.00