• SME EM920105
Provide PDF Format

Learn More

SME EM920105

  • Technical Cost Modelling: A Case Study Analysis Of A Composite Crossmember
  • standard by Society of Manufacturing Engineers, 06/01/1992
  • Publisher: SME

$9.00$18.00


COST MODELS HAVE BEEN USED TO ESTIMATE THE COST OF A COMPLEX PROTOTYPE COMPOSITE COMPONENT FOR SEVERAL YEARS. DURING THAT TIME, THE ANALYSIS HAS TRACKED THE ESTIMATED COST AS THE MANUFACTURING PROCESS HAS EVOLVED. PROCESS COST MODELS ARE USEFUL WHEN TRADITIONAL COST ESTIMATING TECHNIQUES DO NOT HAVE A HISTORICAL BASIS TO RELY ON. A COST MODEL CAN BE DEVELOPED TO SIMULATE THE COST WHEN THERE IS A TECHNICAL UNDERSTANDING OF THE MANUFACTURING PROCESS AS WELL AS INSIGHT INTO THE INVESTMENT COSTS REQUIRED. THIS PAPER TRACKS THE COST OF THE LIQUID COMPOSITE MOLDED COMPONENT THROUGH SEVERAL MANUFACTURING SCENARIOS TO DEMONSTRATE THE USEFUL FEEDBACK A MODEL CAN PROVIDE IN THE EARLY STAGES OF PROCESS DEVELOPMENT. THE MODEL IS ALSO USEFUL IN PROVIDING INSIGHT INTO THE SEGMENT OF THE PROCESS WHERE A UNIT DEVELOPMENTAL EFFORT WILL YIELD THE HIGHEST PROCESS IMPROVEMENT. EXAMPLES OF PROCESS IMPROVEME

Related Products

SME FC910378

SME FC910378

Reclaiming Powder..

$9.00 $18.00

SME MS900761

SME MS900761

Unix--The New Generation In Manufacturing..

$9.00 $18.00

SME IQ910283

SME IQ910283

Quality Measures Through Service Gap Analysis..

$9.00 $18.00

SME IQ900467

SME IQ900467

Networking Of Major Systems In Dimensional Metrology..

$9.00 $18.00