• SME MF98-165
Provide PDF Format

Learn More

SME MF98-165

  • Elimination Of Downtime Between Coils
  • standard by Society of Manufacturing Engineers, 11/01/1998
  • Publisher: SME

$9.00$18.00


The average production line loses 20-30% of its productive day due to downtime for coil changes and rethreading. The same equipment can product 20-30% more parts in a day by adding a coil end joiner and a FLOOP (registered) to the line. In addition, continuous running means less scrap, less tool wear, and better quality of parts.

Related Products

SME MF920131

SME MF920131

Bore Finishing Precision Servo-Motors..

$9.00 $18.00

SME IQ900372

SME IQ900372

Noncontact High-Speed Tube Gaging System..

$9.00 $18.00

SME MR99-173

SME MR99-173

Small Hole Tapping Of Difficult-To-Cut Materials By Means Of Step Vibration Cutting..

$9.00 $18.00

SME MR95-171

SME MR95-171

Simulation Wheel Topography For Ceramic Grinding Analysis..

$9.00 $18.00