• SME MS900481
Provide PDF Format

Learn More

SME MS900481

  • Scheduling Semiconductor Test Operations: Optimization And Approximation
  • standard by Society of Manufacturing Engineers, 06/01/1990
  • Publisher: SME

$9.00$18.00


A METHODOLOGY IS PROPOSED FOR SCHEDULING SEMICONDUCTOR TEST OPERATIONS. WHILE CURRENT PRACTICE IN INDUSTRY IS BASED ON DISPATCHING RULES, OUR METHODOLOGY TAKES A MORE GLOBAL APPROACH. THE FACILITY OR JOB SHOP IS DECOMPOSED INTO A NUMBER OF WORKCENTERS. THE METHODOLOGY PROCEEDS BY SEQUENCING ONE WORKCENTER AT A TIME. A DISJUNCTIVE GRAPH REPRESENTATION OF THE FACILITY MODELS THE INTERACTIONS OF THE WORKCENTERS. ALGORITHMS MINIMIZE MAXIMUM LATENESS AND NUMBER OF TARDY JOBS ON TESTERS AND BATCH PROCESSING MACHINES. THE OVERALL METHODOLOGY HAS BEEN IMPLEMENTED ON A SET OF PROBLEMS BASED ON A REAL INDUSTRY SETTING.

Related Products

SME IQ920287

SME IQ920287

Spin-Flow Necking..

$9.00 $18.00

SME MS900168

SME MS900168

Trend Is Less "Islands Of Automation" And Towards Integration..

$9.00 $18.00

SME AD900559

SME AD900559

Intelligent, Real-Time, Predictive Monitoring, Control, And..

$9.00 $18.00

SME MM920122

SME MM920122

Design Perspective For The Systems Architect..

$9.00 $18.00