• SME MS900746
Provide PDF Format

Learn More

SME MS900746

  • Generative Process Planning From Pdes: Ramp Goes
  • standard by Society of Manufacturing Engineers, 06/01/1990
  • Publisher: SME

$9.00$18.00


CONVENTIONAL COMPUTER-AIDED PROCESS PLANNING SYSTEMS SELDOM PRODUCE MORE THAN A LIMITED WORKSTATION ROUTING SHEET AND BILL OF MATERIALS. UNFORTUNATELY, A SIGNIFICANT PORTION OF THE TOTAL PLANNING TASK REMAINS INCOMPLETE. AS A RESULT, MUCH TIME-CONSUMING DETAIL WORK MUST STILL BE PERFORMED BY SOME OTHER MEANS. THESE SYSTEMS ARE UNABLE TO HAVE A SUBSTANTIAL IMPACT ON THE OVERALL MANUFACTURING ENGINEERING CYCLE BECAUSE THEY CANNOT PROVIDE A COMPLETE SYSTEM. THEY CANNOT PROVIDE A COMPLETE SYSTEM BECAUSE THEY DO NOT HAVE A COMPREHENSIVE FEATURE-BASED PART MODEL WITH WHICH TO REASON, CANNOT SHARE PART DATA AND IMPORTANT HIGH-LEVEL DECISIONS, AND FAIL TO EFFECTIVELY DIVIDE THE LABOR BETWEEN THE HUMAN PLANNER AND THE COMPUTER. THE RAPID ACQUISITION OF MANUFACTURE PARTS (RAMP) PROGRAM IS A U.S. NAVY LOGISTICS EFFORT TO DECREASE THE COST AND PROCUREMENT LEADTIMES INHERENT IN MANUFACTURING SMALL Q

Related Products

SME AD900127

SME AD900127

New Developments In Structural Adhesives..

$9.00 $18.00

SME MF930160

SME MF930160

Coolant And Lubricant Filtration Systems..

$9.00 $18.00

SME MS910321

SME MS910321

Point-To-Point Motion Planning For Flexible Manipulators Using The Algebra Of Rotations..

$9.00 $18.00

SME ER95-219

SME ER95-219

The Latest In Vision Technology In Today'S Food And Beverage Container Manufacturing Industry..

$9.00 $18.00