• SME MS95-114
Provide PDF Format

Learn More

SME MS95-114

  • Finite Capacity Scheduling For Fast Response
  • standard by Society of Manufacturing Engineers, 06/01/1995
  • Publisher: SME

$9.00$18.00


IN THIS PAPER, DIFFERENT SCHEDULING TECHNIQUES AND THEIR PROS AND CONS ARE EXAMINED. THE RELATIONSHIP BETWEEN MRP, INVENTORY MANAGEMENT, AND FINITE CAPACITY SCHEDULING IS ALSO PRESENTED. IT IS SHOWN THAT, MAXIMAL GAINS CAN ONLY BE OBTAINED IF THE FINITE CAPACITY SCHEDULING SYSTEMS ARE INSTALLED IN A WAY THAT ALL TYPES OF INVENTORY AS WELL AS MACHINES AND RESOURCES ARE SIMULTANEOUSLY TAKEN INTO ACCOUNT. FURTHERMORE, DIFFERENT SCENARIOS ARE PRESENTED OUTLINING THE DEPLOYMENT OF FINITE CAPACITY SCHEDULING SYSTEMS SO THE HIGHEST BENEFITS CAN BE OBTAINED FROM THE SYSTEM DEPLOYMENT. SOME OF THE PROCEDURAL AND CULTURAL ISSUES ARE ALSO ADDRESSED.

Related Products

SME EM980105

SME EM980105

Hot Drape Forming Of Thermoset Prepegs..

$46.00 $91.00

SME MR95-169

SME MR95-169

Ultrasonic Superimposed Grinding Of Advanced Ceramics..

$9.00 $18.00

SME MR930334

SME MR930334

Practical Applications Of The Systems Approach To Grinding With Vitrified Cbn Wheels..

$9.00 $18.00

SME FC95-258

SME FC95-258

Equipment Design Considerations For Radiation Curing..

$9.00 $18.00